Product Video
Commercial Power Rack MF-PR100
The MF-PR100 Commercial Power Rack is the foundation of any serious strength training area. 11-gauge steel with 2″×3″ uprights and Westside hole spacing (1″ through bench zone, 2″ above/below). 1,000 lb rated J-hooks with UHMW protection. Adjustable safety straps (not pin/pipe) for safer training. Integrated pull-up bar with 3 grip widths. Weight storage for 12 Olympic plates on rear uprights. Band peg holes for accommodating resistance. 90″ height.
Key Features
11-Gauge Structural Steel
Fully welded construction with laser-cut numbered uprights — zero wobble at max loads
ILD 50+ Firm Padding
High-density foam maintains shape under 600+ lb loads — no bottoming out
Spring-Loaded Adjustments
Quick-release pull-pin mechanisms with audible lock confirmation
Marine-Grade Vinyl
Sweat-resistant, crack-resistant, antimicrobial upholstery
Non-Slip Rubber Feet
Floor-protecting, vibration-dampening rubber pads
Technical Specifications
Construction & Materials
| Frame Material | 11-gauge 2"×3" steel uprights, UHMW J-hooks, nylon safety straps |
|---|---|
| Steel Gauge / Wall Thickness | 11-gauge (3.0mm) structural steel |
| Footprint (L x W x H) | 60"L × 48"W × 90"H |
| Machine Weight | 210 |
Performance & Capacity
| Load Capacity | 1000 |
|---|---|
| Max User Weight | 600 lbs (272 kg) including loaded weight |
Detailed Specifications
| Uprights | 2"×3", 11-gauge |
|---|---|
| Hole Spacing | Westside (1" zone) |
| J-Hooks | UHMW-lined, 1,000 lb rated |
| Safety | Nylon straps |
| Pull-Up | 3 grip widths |
| Plate Storage | 12 Olympic horns |
| Color | Black/Red |
| Uprights | 11-gauge steel, laser-cut numbering |
| Padding | High-density (ILD 50+) firm foam |
| Upholstery | Marine-grade vinyl, double-stitched |
| Adjustments | Spring-loaded pull-pin, 7+ positions |
| Feet | Non-slip rubber with floor protection |
| Finish | Electrostatic powder coat |
Warranty & Support
| Warranty | Lifetime frame, 2 years accessories |
|---|---|
| Shipping & Delivery | LTL freight; 1–3 weeks lead time. Assembly required (1–2 hours). |