Product Video
Horizontal Leg Press MF-LP200
The MF-LP200 Horizontal Leg Press Machine provides a unique stimulus for quad-dominant leg training. The horizontal sled design places more emphasis on the quadriceps compared to angled variations. 1,200 lb capacity with a smooth 2-guide rod linear bearing system. Adjustable back rest with breathable premium upholstery. Compact horizontal design works well in facilities with height limitations. Integrated weight storage and safety lock system.
Key Features
Reinforced Steel Frame
Heavy-gauge oval tubing at all pivot points eliminates frame flex even under max load
3-Position Adjustable Footplate
Change press angle to target different quad/glute activation patterns
Oversized Sealed Bearings
Commercial cartridge bearings at the main pivot for friction-free motion
Auto-Lock Safety System
Independent safety catches engage automatically — train heavy alone with confidence
Ergonomic Lumbar Support
Contoured back pad with adjustable angle for reduced lower back strain
Technical Specifications
Construction & Materials
| Frame Material | 11-gauge steel, chrome guide rods, sealed bearings |
|---|---|
| Steel Gauge / Wall Thickness | 11-gauge (3.0mm) reinforced steel tubing |
| Footprint (L x W x H) | 86"L × 54"W × 48"H |
| Machine Weight | 475 |
Performance & Capacity
| Load Capacity | 1200 |
|---|---|
| Max User Weight | 400 lbs (182 kg) |
Detailed Specifications
| Frame | 11-gauge steel |
|---|---|
| Guide Rods | 2×30mm chrome |
| Capacity | 1,200 lb |
| Footplate | 60"×20" |
| Back Rest | Premium dual-layer upholstery |
| Safety | 4-point catch |
| Color | Black/Gray |
| Footplate | Diamond-tread, 3-position angle adjustable |
| Pivot Bearings | Oversized sealed cartridge bearings |
| Back Pad | 4-position adjustable (106°–130° range) |
| Safety Stops | Auto-lock limiting mechanism |
| Handles | Non-slip rubber-coated, multi-position |
| Upholstery | Marine-grade vinyl, double-stitched |
Warranty & Support
| Warranty | Lifetime frame, 2 years parts |
|---|---|
| Shipping & Delivery | Freight delivery; 2–4 weeks lead time. Assembly required (3–4 hours for 2-person team). |